Term and Conditions and 
Extent and Agreed limitations on the inspection and testing
For anElectrical Installation Condition Report (EICR)

24/09/2022


Prices are based on:-


EICR in Solihull or surrounding areas, extra charge may be encored for out of area 

Areas covered are B90, B91, B92, B93, B94, B95, CV7 7, CV8 1, CV8 2, CV34, CV35 7, CV35 8, CV37

EICR with 1 fuse board (Extra boards £66 (up to 4 way), £88 (up to 8 way), £110 (up to 12 way)) each

Testing and report carried out my PJS Services 


Extent of the electrical installation covered by this report: -


Circuits tested – All that are requested   

Does this report include fixed equipment (e.g. flood lights, heated towel rails, extractor fans) – NO

Does this report record departures to related building regulations - NO

Does this report include shed – YES if applicable

Does this report include garden lighting  - YES if applicable

Does this report include garage – YES if applicable or if requested if detached

Does this report include loft (area around hatch) – YES if applicable

Does this report include mains powered smoke alarms – YES if applicable

 

Agreed limitations on the inspection and testing:-


Insulation resistance test between live and neutral - NO       

Percentage of sockets tested - 100%     

Percentage of sockets visual inspected - 10% (minimum)     

Percentage of lights or corresponding switch tested for presence earth conductors - 100%

Percentage of lights visual inspected - 10% (minimum) 

Testing sockets for integrated appliances (if not accessible) – NO         

Inspection main cut-out fuse (if not accessible) – NO

Cables installed under floors, above ceilings, in walls/ partitions, will NOT been inspected.

Band II cables segregated/separated from Band I cables, will NOT been inspected.

Cables segregated/separated from communications cabling, will NOT been inspected.

Cables segregated/separated from non-electrical services, will NOT been inspected.

            © Copyright landlord reports and pjs services